Solar · United Kingdom
Hendir Uchaf Farm, Minffrwd Road - Solar Array
Operator Shillibier Limited
Application Submitted1.5 MWData checked 16 November 2026Source record dated 2 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hendir Uchaf Farm, Minffrwd Road - Solar Array is a 1.5 MW solar farm on the edge of Brynna, Mid Glamorgan, United Kingdom. Its planning application (P/25/717/FUL) went to Bridgend on 18 December 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 42 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hendir Uchaf Farm, Minffrwd Road - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hendir Uchaf Farm, Minffrwd Road - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 50 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 50 km | Minor |
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 64 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 64 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Shillibier Limited
- Location
- Hendir Uchaf Farm Rhiwceiliog, Mid Glamorgan, CF35 6NS, United Kingdom
- Planning authority
- Bridgend
- Planning application
- P/25/717/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/25/717/FUL, with what the planning evidence pack adds for this site.
Every application in Bridgend · Alerts for applications and incidents near here
Timeline
- 18 December 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Hendir Uchaf Farm, Minffrwd Road - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hendir Uchaf Farm, Minffrwd Road - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hendir Uchaf Farm, Minffrwd Road - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hendir Uchaf Farm, Minffrwd Road - Solar Array?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2026.
- Where is Hendir Uchaf Farm, Minffrwd Road - Solar Array?
- On the edge of Brynna, Mid Glamorgan, United Kingdom (postcode CF35 6NS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).