Onshore wind · United Kingdom

Mynydd Portref Wind Farm extension

Operator REG Windpower

Operational12 MWData checked 16 November 2026Source record dated 18 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd Portref Wind Farm extension is a 12 MW wind farm on the edge of Llanharan, Mid Glamorgan, United Kingdom. Its planning application (12/0704/10) went to Rhondda Cynon Taf on 29 June 2012 and was granted on 19 December 2014. It has been operating since 1 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 42 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 22 other sites and 390 energy sites within 40 km for Mynydd Portref Wind Farm extension

Members see the sites and incidents around this one, and every record behind them.

REG WINDPOWER LIMITED (02431173), active, since 1989. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
12 MW (this record)
All phases
21.4 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
REG Windpower
Location
Mid Glamorgan, United Kingdom
Planning authority
Rhondda Cynon Taf
Planning application
12/0704/10
First operating
2017
Turbines
6

This record is 12 MW, one part of a site built in phases. With Mynydd Portref (9.4 MW) the phases on the register add up to 21.4 MW. Mynydd Portref

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/0704/10, with what the planning evidence pack adds for this site.

Every application in Rhondda Cynon Taf · Alerts for applications and incidents near here

  • 29 June 2012 Planning application submitted
  • 19 December 2014 Planning permission granted
  • 11 April 2016 Construction started
  • 1 March 2017 Operational

None found. The register holds no published incident that names Mynydd Portref Wind Farm extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mynydd Portref Wind Farm extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Portref Wind Farm extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mynydd Portref Wind Farm extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2017.
Where is Mynydd Portref Wind Farm extension?
On the edge of Llanharan, Mid Glamorgan, United Kingdom.