Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Troston Loch

Operator EDF Energy Renewables

Awaiting Construction67.2 MWData checked 16 November 2026Source record dated 15 January 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Troston Loch is a 67.2 MW wind farm 32 km north-west of Dumfries, United Kingdom. Its planning application (ECU00001785) went to Scottish Government (S36) on 21 February 2019 and was granted on 18 December 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Troston Loch sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 37 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm37 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm44 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire46 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
67.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Location
Troston Loch Wind Farm, New Abbey, West Of Moniaive, Dumfries, Dumfries and Galloway, Dumfries and Galloway, DG2 8EF, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001785
Turbines
14, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001785, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 21 February 2019 Planning application submitted
  • 18 December 2020 Planning permission granted
  • 18 December 2026 Planning permission runs out

None found. The register holds no published incident that names Troston Loch. If you know of one, report it (confidential reports are anonymised).

Has Troston Loch had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Troston Loch; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Troston Loch?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 January 2021.
Where is Troston Loch?
32 km north-west of Dumfries, United Kingdom (postcode DG2 8EF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).