← Back to Cornwall

Solar · United Kingdom

Trequite Farm solar park

Operator Elgin Energy EsCo

Operational9.9 MWData checked 16 November 2026Source record dated 1 October 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Trequite Farm solar park is a 9.9 MW solar farm 7.7 km south-east of Liskeard, Cornwall, United Kingdom. Its planning application (PA13/04650) went to Cornwall on 24 May 2013 and was granted on 22 August 2013. It has been operating since 31 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 24 other sites and 234 energy sites within 40 km for Trequite Farm solar park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
9.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Elgin Energy EsCo
Location
Land at Trequite Farm, Menheniot, Liskeard, Cornwall, PL14 3RQ, United Kingdom
Planning authority
Cornwall
Planning application
PA13/04650
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA13/04650, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 24 May 2013 Planning application submitted
  • 22 August 2013 Planning permission granted
  • 31 March 2014 Operational

None found. The register holds no published incident that names Trequite Farm solar park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Trequite Farm solar park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Trequite Farm solar park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Trequite Farm solar park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2014.
Where is Trequite Farm solar park?
7.7 km south-east of Liskeard, Cornwall, United Kingdom (postcode PL14 3RQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).