Solar · United Kingdom
Higher Trevartha Farm
Operator Smarter Energy Solutions Ltd
Operational3 MWData checked 16 November 2026Source record dated 16 August 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Higher Trevartha Farm is a 3 MW solar farm on the edge of Liskeard, Cornwall, United Kingdom. Its planning application (PA12/01530) went to Cornwall on 1 August 2012 and was granted on 1 August 2012. It has been operating since 31 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Higher Trevartha Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Smarter Energy Solutions Ltd
- Location
- Pengover Liskeard, Cornwall, PL14 3NJ, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA12/01530
- First operating
- 2013
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA12/01530, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 1 August 2012 Planning permission granted
- 1 August 2012 Planning application submitted
- 31 March 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Higher Trevartha Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Higher Trevartha Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Higher Trevartha Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Higher Trevartha Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2013.
- Where is Higher Trevartha Farm?
- On the edge of Liskeard, Cornwall, United Kingdom (postcode PL14 3NJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).