Onshore wind · United Kingdom

Tomchrasky Estate Wind farm

Operator E Power Limited · Owner Asper Iona Holding Company Limited

Awaiting Construction84 MWData checked 16 November 2026Source record dated 1 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tomchrasky Estate Wind farm is a 84 MW wind farm 43 km north-east of Fort William, Highland, United Kingdom. Its planning application (ECU00004663) went to Scottish Government (S36) on 21 November 2022 and was granted on 6 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

E POWER LIMITED (04625938), active, since 2002. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tomchrasky Estate Wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 61 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm61 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK61 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment61 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
84 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
E Power Limited
Owner
Asper Iona Holding Company Limited
Location
900m Ne/O Beinn An T-Sidhein Dalchreichart, Highland, IV3, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004663
Turbines
14, 185 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004663, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 21 November 2022 Planning application submitted
  • 6 May 2025 Planning permission granted
  • 6 May 2028 Planning permission runs out

None found. The register holds no published incident that names Tomchrasky Estate Wind farm. If you know of one, report it (confidential reports are anonymised).

Has Tomchrasky Estate Wind farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tomchrasky Estate Wind farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Tomchrasky Estate Wind farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2025.
Where is Tomchrasky Estate Wind farm?
43 km north-east of Fort William, Highland, United Kingdom (postcode IV3).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).