← Back to Highland

Energy sites / United Kingdom / Highland

Battery storage · United Kingdom

Auchteraw Energy Storage

Application Withdrawn20 MWChecked 6 October 2026Last changed in the dataset 5 January 2023

Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Shires Hamilton
Location
Land 280M Se Of Torrdhuin, Auchterawe, Fort Augustus, Highlands, Highland, PH32 4BT, United Kingdom
Planning authority
Highland
Planning application
19/05385/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 6 December 2019 Planning application submitted
  • 29 June 2020 Application withdrawn

None found. The register holds no published incident that names Auchteraw Energy Storage. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.