← Back to Highland

Battery storage · United Kingdom

Torrdhuin, Auchteraw Battery Storage Facility

Operator Field Energy

Operational49.9 MWData checked 16 November 2026Source record dated 22 September 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Torrdhuin, Auchteraw Battery Storage Facility is a 49.9 MW battery storage site 42 km north-east of Fort William, Highland, United Kingdom. Its planning application (20/04565/FUL) went to Highland on 18 November 2020 and was granted on 9 March 2021. It has been operating since 22 August 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 10 other sites and 49 energy sites within 40 km for Torrdhuin, Auchteraw Battery Storage Facility

Members see the sites and incidents around this one, and every record behind them.

FIELD ENERGY LTD (08315910), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Field Energy
Location
Land 325M SW Of Torrdhuin, Highland, PH32 4BT, United Kingdom
Planning authority
Highland
Planning application
20/04565/FUL
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/04565/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 18 November 2020 Planning application submitted
  • 9 March 2021 Planning permission granted
  • 25 September 2023 Construction started
  • 22 August 2025 Operational

None found. The register holds no published incident that names Torrdhuin, Auchteraw Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Torrdhuin, Auchteraw Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Torrdhuin, Auchteraw Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Torrdhuin, Auchteraw Battery Storage Facility?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 September 2025.
Where is Torrdhuin, Auchteraw Battery Storage Facility?
42 km north-east of Fort William, Highland, United Kingdom (postcode PH32 4BT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).