Battery storage · United Kingdom

Tomchrasky Estate Wind farm

Operator E Power Limited · Owner Asper Iona Holding Company Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 1 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Tomchrasky Estate Wind farm is a 50 MW battery storage site 43 km north-east of Fort William, Highland, United Kingdom. Its planning application (ECU00004663) went to Scottish Government (S36) on 21 November 2022 and was granted on 6 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

E POWER LIMITED (04625938), active, since 2002. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tomchrasky Estate Wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 437 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool437 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells509 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire635 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
E Power Limited
Owner
Asper Iona Holding Company Limited
Location
900m Ne/O Beinn An T-Sidhein Dalchreichart, Highland, IV3, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004663

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004663, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 21 November 2022 Planning application submitted
  • 6 May 2025 Planning permission granted
  • 6 May 2028 Planning permission runs out

None found. The register holds no published incident that names Tomchrasky Estate Wind farm. If you know of one, report it (confidential reports are anonymised).

Has Tomchrasky Estate Wind farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tomchrasky Estate Wind farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tomchrasky Estate Wind farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2025.
Where is Tomchrasky Estate Wind farm?
43 km north-east of Fort William, Highland, United Kingdom (postcode IV3).