Solar · United Kingdom
Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels
Operator Novus Renewable Services Limited · Owner Innova Capital Limited
Under Construction25 MWData checked 16 November 2026Source record dated 11 September 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels is a 25 MW solar farm on the edge of Bedworth, West Midlands, United Kingdom. Its planning application (39235) went to Rugby on 17 October 2022 and was granted on 31 August 2023. Construction started on 1 April 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 66 other energy sites within 10 km, 50 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
NOVUS RENEWABLE SERVICES II LIMITED (16616400), active, since 2025. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 27 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 27 km | Minor |
| EIR-2151 | 2018 | Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge | 34 km | Significant |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 35 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 25 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Novus Renewable Services Limited
- Owner
- Innova Capital Limited
- Location
- Tolldish Hall Farm Parrotts Grove, Coventry, West Midlands, CV2 1NR, United Kingdom
- Planning authority
- Rugby
- Planning application
- 39235
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 39235, with what the planning evidence pack adds for this site.
Every application in Rugby · Alerts for applications and incidents near here
Timeline
- 17 October 2022 Planning application submitted
- 31 August 2023 Planning permission granted
- 1 April 2024 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 September 2025.
- Where is Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels?
- On the edge of Bedworth, West Midlands, United Kingdom (postcode CV2 1NR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).