Battery storage · United Kingdom

Pivot Power Coventry (Coventry National Grid Substation)

Operator Pivot Power · Owner Pivoted Power LLP

Operational49.9 MWData checked 16 November 2026Source record dated 25 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Pivot Power Coventry (Coventry National Grid Substation) is a 49.9 MW battery storage site on the edge of Bedworth, West Midlands, United Kingdom. Its planning application (FUL/2020/1476) went to Coventry on 2 July 2020 and was granted on 22 January 2021. It has been operating since 1 December 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 67 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 12 other sites and 632 energy sites within 40 km for Pivot Power Coventry (Coventry National Grid Substation)

Members see the sites and incidents around this one, and every record behind them.

PIVOT POWER LIMITED (12032042), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Pivot Power
Owner
Pivoted Power LLP
Location
National Grid Substation, Parrotts Grove, Coventry, West Midlands, West Midlands, CV2 1NQ, United Kingdom
Planning authority
Coventry
Planning application
FUL/2020/1476
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for FUL/2020/1476, with what the planning evidence pack adds for this site.

Every application in Coventry · Alerts for applications and incidents near here

  • 2 July 2020 Planning application submitted
  • 22 January 2021 Planning permission granted
  • 1 July 2022 Construction started
  • 1 December 2023 Operational

None found. The register holds no published incident that names Pivot Power Coventry (Coventry National Grid Substation). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pivot Power Coventry (Coventry National Grid Substation) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pivot Power Coventry (Coventry National Grid Substation); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pivot Power Coventry (Coventry National Grid Substation)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2025.
Where is Pivot Power Coventry (Coventry National Grid Substation)?
On the edge of Bedworth, West Midlands, United Kingdom (postcode CV2 1NQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).