Solar · United Kingdom

Lentons Lane Solar Farm

Operator Coventry City Council

Application Refused30 MWData checked 16 November 2026Source record dated 2 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lentons Lane Solar Farm is a 30 MW solar farm 3.9 km south-east of Bedworth, West Midlands, United Kingdom. Its planning application (PL/2023/0001062/FULM) went to Coventry on 30 May 2023 and was refused on 21 March 2024. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 65 other energy sites within 10 km, 49 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

637 energy sites within 40 km for Lentons Lane Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Coventry City Council
Location
Land At Lentons Lane, Coventry, West Midlands, CV2 1AA, United Kingdom
Planning authority
Coventry
Planning application
PL/2023/0001062/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2023/0001062/FULM, with what the planning evidence pack adds for this site.

Every application in Coventry · Alerts for applications and incidents near here

  • 30 May 2023 Planning application submitted
  • 21 March 2024 Planning permission refused

None found. The register holds no published incident that names Lentons Lane Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lentons Lane Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lentons Lane Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lentons Lane Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 April 2024.
Where is Lentons Lane Solar Farm?
3.9 km south-east of Bedworth, West Midlands, United Kingdom (postcode CV2 1AA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).