Battery storage · United Kingdom
Sundon Substation
Operator Pivot Power · Owner Edf Energy Renewables Limited
Revised49.9 MWData checked 16 November 2026Source record dated 30 April 2019
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Sundon Substation is a 49.9 MW battery storage site 5.2 km north of Dunstable, Bedfordshire, United Kingdom. Its planning application (CB/19/00200/FULL) went to Central Bedfordshire on 23 January 2019. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 66 other energy sites within 10 km, 28 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Sundon Substation changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PIVOT POWER LIMITED (12032042), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sundon Substation sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 80 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 80 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 101 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 139 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Pivot Power
- Owner
- Edf Energy Renewables Limited
- Location
- Sundon 400KV Substation, Waterend Lane, Chalton, Bedfordshire, LU4 9UL, United Kingdom
- Planning authority
- Central Bedfordshire
- Planning application
- CB/19/00200/FULL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CB/19/00200/FULL, with what the planning evidence pack adds for this site.
Every application in Central Bedfordshire · Alerts for applications and incidents near here
Timeline
- 23 January 2019 Planning application submitted
- 30 April 2022 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Sundon Substation. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Sundon Substation had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sundon Substation; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Sundon Substation?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 30 April 2019.
- Where is Sundon Substation?
- 5.2 km north of Dunstable, Bedfordshire, United Kingdom (postcode LU4 9UL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).