Battery storage · United Kingdom
Pivot Power Sundon (Sundon Substation)
Operator Pivot Power & EDF Energy Renewables · Owner Pivoted Power LLP
Operational49.9 MWData checked 16 November 2026Source record dated 6 March 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Pivot Power Sundon (Sundon Substation) is a 49.9 MW battery storage site 5.3 km north of Dunstable, Bedfordshire, United Kingdom. Its planning application (CB/21/02829/FULL) went to Central Bedfordshire on 12 July 2021 and was granted on 26 January 2022. It has been operating since 1 December 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 65 other energy sites within 10 km, 28 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Pivot Power Sundon (Sundon Substation) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 7 Nov: 1,350 MWh out and 1,613 MWh in, active 73% of half hours, peak 24 MW of 50. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £5,677 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
PIVOTED POWER LLP (OC420973), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Pivot Power & EDF Energy Renewables
- Owner
- Pivoted Power LLP
- Location
- Adj National Grid Sundon Substation, Water End Lane, Chalton, Bedfordshire, LU4 9UJ, United Kingdom
- Planning authority
- Central Bedfordshire
- Planning application
- CB/21/02829/FULL
- First operating
- 2025
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CB/21/02829/FULL, with what the planning evidence pack adds for this site.
Every application in Central Bedfordshire · Alerts for applications and incidents near here
Timeline
- 12 July 2021 Planning application submitted
- 26 January 2022 Planning permission granted
- 1 December 2025 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Pivot Power Sundon (Sundon Substation). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Pivot Power Sundon (Sundon Substation) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Pivot Power Sundon (Sundon Substation); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Pivot Power Sundon (Sundon Substation)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 March 2026.
- Where is Pivot Power Sundon (Sundon Substation)?
- 5.3 km north of Dunstable, Bedfordshire, United Kingdom (postcode LU4 9UJ).