Operational49.9 MWChecked 6 October 2026Last changed in the dataset 6 March 2026

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Status
Operational
Operator or applicant
Pivot Power / EDF Energy Renewables
Location
Adj National Grid Sundon Substation, Water End Lane, Chalton, Bedfordshire, LU4 9UJ, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/21/02829/FULL
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 12 July 2021 Planning application submitted
  • 26 January 2022 Planning permission granted
  • 1 December 2025 Operational

None found. The register holds no published incident that names Sundon Substation. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.