Solar · United Kingdom

The Village Of Halse - Solar Array

Operator Novus Renewable Services Limited · Owner Innova Capital Limited

Awaiting Construction25 MWData checked 16 November 2026Source record dated 30 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Village Of Halse - Solar Array is a 25 MW solar farm 7.6 km north-west of Taunton, Somerset, United Kingdom. Its planning application (23/22/0028) went to Somerset on 26 October 2022 and was granted on 26 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

NOVUS RENEWABLE SERVICES II LIMITED (16616400), active, since 2025. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Village Of Halse - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea23 kmMinor
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton29 kmMinor
EIR-14862026Fire under solar panels at Broadclyst brought under control37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Novus Renewable Services Limited
Owner
Innova Capital Limited
Location
The N/O Preston Bowyer and S/O the village of Halse, Somerset, TA4, United Kingdom
Planning authority
Somerset
Planning application
23/22/0028

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/22/0028, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 26 October 2022 Planning application submitted
  • 26 January 2024 Planning permission granted
  • 26 January 2027 Planning permission runs out

None found. The register holds no published incident that names The Village Of Halse - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has The Village Of Halse - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Village Of Halse - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Village Of Halse - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 January 2024.
Where is The Village Of Halse - Solar Array?
7.6 km north-west of Taunton, Somerset, United Kingdom (postcode TA4).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).