Solar · United Kingdom
Brose, Colliery Lane North - Solar Panels
Operator Brose (UK) Limited
Application Refused0.6 MWData checked 16 November 2026Source record dated 27 January 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Brose, Colliery Lane North - Solar Panels is a 0.6 MW solar farm in Bedworth, West Midlands, United Kingdom. Its planning application (40564) went to Nuneaton and Bedworth on 8 October 2024 and was refused on 27 November 2024. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 65 other energy sites within 10 km, 49 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Brose, Colliery Lane North - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Brose (UK) Limited
- Location
- Brose, Colliery Lane North, Exhall, West Midlands, CV7 9NW, United Kingdom
- Planning authority
- Nuneaton and Bedworth
- Planning application
- 40564
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 40564, with what the planning evidence pack adds for this site.
Every application in Nuneaton and Bedworth · Alerts for applications and incidents near here
Timeline
- 8 October 2024 Planning application submitted
- 27 November 2024 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Brose, Colliery Lane North - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Brose, Colliery Lane North - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Brose, Colliery Lane North - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Brose, Colliery Lane North - Solar Panels?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 27 January 2025.
- Where is Brose, Colliery Lane North - Solar Panels?
- In Bedworth, West Midlands, United Kingdom (postcode CV7 9NW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).