← Back to Warwickshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage

Operator Sirius Environmental Limited · Owner Sirius Engineering Group LTD

Revised5 MWData checked 16 November 2026Source record dated 10 June 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage is a 5 MW battery storage site on the edge of Bedworth, Warwickshire, United Kingdom. Its planning application (39547) went to Nuneaton and Bedworth on 5 April 2023 and was withdrawn on 24 July 2023. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 64 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

SIRIUS ENVIRONMENTAL LTD (07057801), active, since 2009. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 76 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells76 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire90 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool139 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Sirius Environmental Limited
Owner
Sirius Engineering Group LTD
Location
Bedworth Lane, Astley Lane, Coolliery Wood, Warwickshire, CV12 0LP, United Kingdom
Planning authority
Nuneaton and Bedworth
Planning application
39547

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 39547, with what the planning evidence pack adds for this site.

Every application in Nuneaton and Bedworth · Alerts for applications and incidents near here

  • 5 April 2023 Planning application submitted
  • 24 July 2023 Application withdrawn

None found. The register holds no published incident that names Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 10 June 2024.
Where is Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage?
On the edge of Bedworth, Warwickshire, United Kingdom (postcode CV12 0LP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).