Solar · United Kingdom
Newgate Coolliery - Solar Farm & Battery Storage
Operator Sirius Environmental Limited · Owner Sirius Engineering Group LTD
Application Submitted6 MWData checked 16 November 2026Source record dated 10 June 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Newgate Coolliery - Solar Farm & Battery Storage is a 6 MW solar farm on the edge of Bedworth, Warwickshire, United Kingdom. Its planning application (40290) went to Nuneaton and Bedworth on 10 May 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 64 other energy sites within 10 km, 48 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Newgate Coolliery - Solar Farm & Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SIRIUS ENVIRONMENTAL LTD (07057801), active, since 2009. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newgate Coolliery - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 76 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 76 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 90 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 139 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Sirius Environmental Limited
- Owner
- Sirius Engineering Group LTD
- Location
- Bedworth Lane, Astley Lane, Coolliery Wood, Warwickshire, CV12 0LP, United Kingdom
- Planning authority
- Nuneaton and Bedworth
- Planning application
- 40290
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 40290, with what the planning evidence pack adds for this site.
Every application in Nuneaton and Bedworth · Alerts for applications and incidents near here
Timeline
- 10 May 2024 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Newgate Coolliery - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Newgate Coolliery - Solar Farm & Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Newgate Coolliery - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Newgate Coolliery - Solar Farm & Battery Storage?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 10 June 2024.
- Where is Newgate Coolliery - Solar Farm & Battery Storage?
- On the edge of Bedworth, Warwickshire, United Kingdom (postcode CV12 0LP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).