Solar · United Kingdom
The Grange
Operator Lightsource BP · Owner Grange Solar Farm Limited
Operational49.9 MWData checked 16 November 2026Source record dated 1 April 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
The Grange is a 49.9 MW solar farm on the edge of Newark on Trent, Nottinghamshire, United Kingdom. Its planning application (19/01408/FULM) went to Newark and Sherwood on 9 August 2019 and was granted on 28 June 2023. It has been operating since 1 April 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when The Grange changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Lightsource BP
- Owner
- Grange Solar Farm Limited
- Location
- The Grange, Cotham Lane, Hawton, Newark, Nottinghamshire, Nottinghamshire, NG24 3RJ, United Kingdom
- Planning authority
- Newark and Sherwood
- Planning application
- 19/01408/FULM
- First operating
- 2021
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/01408/FULM, with what the planning evidence pack adds for this site.
Every application in Newark and Sherwood · Alerts for applications and incidents near here
Timeline
- 9 August 2019 Planning application submitted
- 26 July 2020 Construction started
- 1 April 2021 Operational
- 28 June 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names The Grange. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has The Grange had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names The Grange; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of The Grange?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2021.
- Where is The Grange?
- On the edge of Newark on Trent, Nottinghamshire, United Kingdom (postcode NG24 3RJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).