Battery storage · United Kingdom

Pentir Substation, Pentir - Battery Energy Storage

Operator Lightsource BP · Owner Lightsource SPV 191 Limited

Awaiting Construction57 MWData checked 16 November 2026Source record dated 28 October 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Pentir Substation, Pentir - Battery Energy Storage is a 57 MW battery storage site 5.1 km south-west of Bangor, Gwynedd, United Kingdom. Its planning application (C24/0532/25/LL) went to Gwynedd on 3 July 2024 and was granted on 9 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pentir Substation, Pentir - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 86 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool86 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells203 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire223 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
57 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Lightsource BP
Owner
Lightsource SPV 191 Limited
Location
Pentir Substation, Pentir, Bangor, Gwynedd, LL57 4ED, United Kingdom
Planning authority
Gwynedd
Planning application
C24/0532/25/LL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for C24/0532/25/LL, with what the planning evidence pack adds for this site.

Every application in Gwynedd · Alerts for applications and incidents near here

  • 9 September 2013 Planning permission expired
  • 3 July 2024 Planning application submitted
  • 9 September 2024 Planning permission granted

None found. The register holds no published incident that names Pentir Substation, Pentir - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Pentir Substation, Pentir - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pentir Substation, Pentir - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pentir Substation, Pentir - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2024.
Where is Pentir Substation, Pentir - Battery Energy Storage?
5.1 km south-west of Bangor, Gwynedd, United Kingdom (postcode LL57 4ED).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).