Seion, Pentir - Battery Energy Storage System

Operator Brockwell Storage & Solar Limited · Owner Brockwell Energy Group (2) Limited

Application Refused99.9 MWData checked 16 November 2026Source record dated 25 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Seion, Pentir - Battery Energy Storage System is a 99.9 MW battery storage site 5.2 km south-west of Bangor, Gwynedd, United Kingdom. Its planning application (C25/0277/18/LL) went to Gwynedd on 8 April 2025 and was refused on 23 January 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 10 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 5 other sites and 60 energy sites within 40 km for Seion, Pentir - Battery Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

BROCKWELL STORAGE & SOLAR LIMITED (09819652), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
99.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Brockwell Storage & Solar Limited
Owner
Brockwell Energy Group (2) Limited
Location
S/O B4547 Seion, Pentir, Llanddeiniolen, Caernarfon, Gwynedd, LL55 3AN, United Kingdom
Planning authority
Gwynedd
Planning application
C25/0277/18/LL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for C25/0277/18/LL, with what the planning evidence pack adds for this site.

Every application in Gwynedd · Alerts for applications and incidents near here

  • 8 April 2025 Planning application submitted
  • 23 January 2026 Planning permission refused

None found. The register holds no published incident that names Seion, Pentir - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Seion, Pentir - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Seion, Pentir - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Seion, Pentir - Battery Energy Storage System?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 25 March 2026.
Where is Seion, Pentir - Battery Energy Storage System?
5.2 km south-west of Bangor, Gwynedd, United Kingdom (postcode LL55 3AN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).