Solar · United Kingdom

Parciau Farm Solar Park

Operator Kronos Solar

Operational13.9 MWData checked 16 November 2026Source record dated 30 September 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Parciau Farm Solar Park is a 13.9 MW solar farm 3.3 km north-east of Caernarfon, Gwynedd, United Kingdom. Its planning application (C14/0498/20/LL) went to Gwynedd on 6 June 2014 and was granted on 22 September 2014. It has been operating since 23 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 20 other sites and 59 energy sites within 40 km for Parciau Farm Solar Park

Members see the sites and incidents around this one, and every record behind them.

KRONOS SOLAR LIMITED (07241181), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
13.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Kronos Solar
Location
Parciau Farm, Griffiths Crossing, Caernarfon, Gwynedd, Gwynedd, LL55 1TS, United Kingdom
Planning authority
Gwynedd
Planning application
C14/0498/20/LL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for C14/0498/20/LL, with what the planning evidence pack adds for this site.

Every application in Gwynedd · Alerts for applications and incidents near here

  • 6 June 2014 Planning application submitted
  • 22 September 2014 Planning permission granted
  • 15 November 2014 Construction started
  • 23 March 2015 Operational

None found. The register holds no published incident that names Parciau Farm Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Parciau Farm Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Parciau Farm Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Parciau Farm Solar Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2015.
Where is Parciau Farm Solar Park?
3.3 km north-east of Caernarfon, Gwynedd, United Kingdom (postcode LL55 1TS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).