Solar · United Kingdom
Hall Farm Solar Farm
Operator Kronos Solar
Application Refused50 MWData checked 16 November 2026Source record dated 14 December 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hall Farm Solar Farm is a 50 MW solar farm in Alfreton, Derbyshire, United Kingdom. Its planning application (AVA/2020/1224) went to Amber Valley on 7 January 2021 and was refused on 5 December 2022. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 54 other energy sites within 10 km, 39 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hall Farm Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
KRONOS SOLAR LIMITED (07241181), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Kronos Solar
- Location
- Hall Farm Church Street Alfreton, Derbyshire, DE55 7AH, United Kingdom
- Planning authority
- Amber Valley
- Planning application
- AVA/2020/1224
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for AVA/2020/1224, with what the planning evidence pack adds for this site.
Every application in Amber Valley · Alerts for applications and incidents near here
Timeline
- 7 January 2021 Planning application submitted
- 5 December 2022 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Hall Farm Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hall Farm Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hall Farm Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hall Farm Solar Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 14 December 2021.
- Where is Hall Farm Solar Farm?
- In Alfreton, Derbyshire, United Kingdom (postcode DE55 7AH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).