Solar · United Kingdom
Meadow Lane Solar Farm
Operator Gresham House & Anesco Limited
Under Construction19.6 MWData checked 16 November 2026Source record dated 10 December 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Meadow Lane Solar Farm is a 19.6 MW solar farm in Alfreton, Derbyshire, United Kingdom. Its planning application (AVA/2021/0313) went to Amber Valley on 9 April 2021 and was granted on 21 October 2021. Construction started on 28 March 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 56 other energy sites within 10 km, 39 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Meadow Lane Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Meadow Lane Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 42 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1265 | 2024 | Solar panels catch fire and destroy three buildings in Harby | 42 km | Significant |
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 49 km | Significant |
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 52 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 19.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Gresham House & Anesco Limited
- Location
- S/O B6025 Meadow Lane, Alfreton, Derbyshire, DE55 7RQ, United Kingdom
- Planning authority
- Amber Valley
- Planning application
- AVA/2021/0313
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for AVA/2021/0313, with what the planning evidence pack adds for this site.
Every application in Amber Valley · Alerts for applications and incidents near here
Timeline
- 9 April 2021 Planning application submitted
- 21 October 2021 Planning permission granted
- 28 March 2023 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Meadow Lane Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Meadow Lane Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Meadow Lane Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Meadow Lane Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 December 2021.
- Where is Meadow Lane Solar Farm?
- In Alfreton, Derbyshire, United Kingdom (postcode DE55 7RQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).