← Back to Derbyshire

Energy sites / United Kingdom / Derbyshire

Solar · United Kingdom

Alfreton Solar Farm

Application Withdrawn25 MWChecked 6 October 2026Last changed in the dataset 31 January 2021

Technology
Solar
Capacity
25 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Kronos Solar
Location
Upper Delves Farm, Pit Lane, Shirland, Alfreton, Derbyshire, DE55 6AU, United Kingdom
Planning authority
North East Derbyshire
Planning application
20/01282/FL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 21 December 2020 Planning application submitted
  • 18 March 2022 Application withdrawn

None found. The register holds no published incident that names Alfreton Solar Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.