Solar · United Kingdom
Chadwicks Farms
Operator Kronos Solar
Revised30 MWData checked 16 November 2026Source record dated 30 September 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Chadwicks Farms is a 30 MW solar farm 4.8 km north of Grove, Oxfordshire, United Kingdom. Its planning application (P14/V0552/FUL) went to Vale of White Horse on 26 March 2014 and was refused on appeal on 17 December 2014. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 24 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Chadwicks Farms changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
KRONOS SOLAR LIMITED (07241181), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chadwicks Farms sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 37 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 37 km | Significant |
| EIR-2109 | 2015 | Solar installer falls through fragile farm roof at Kemble, suffering brain injuries | 43 km | Major |
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 49 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Kronos Solar
- Location
- Land near Chadwick's Farm, Garford, Abingdon, Oxfordshire, OX13 5PH, United Kingdom
- Planning authority
- Vale of White Horse
- Planning application
- P14/V0552/FUL
- Appeal reference
- APP/V3120/W/14/2223429
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P14/V0552/FUL, with what the planning evidence pack adds for this site.
Every application in Vale of White Horse · Alerts for applications and incidents near here
Timeline
- 26 March 2014 Planning application submitted
- 25 June 2014 Planning permission refused
- 18 August 2014 Appeal lodged
- 17 December 2014 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Chadwicks Farms. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Chadwicks Farms had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Chadwicks Farms; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Chadwicks Farms?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2015.
- Where is Chadwicks Farms?
- 4.8 km north of Grove, Oxfordshire, United Kingdom (postcode OX13 5PH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).