Solar · United Kingdom
Goose Willow Farm
Operator IKAROS SOLAR LIMITED
Operational11.5 MWData checked 16 November 2026Source record dated 28 February 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Goose Willow Farm is a 11.5 MW solar farm 5.4 km north-east of Grove, Oxfordshire, United Kingdom. Its planning application (P12/V2112/FUL) went to Vale of White Horse on 18 October 2012 and was granted on 11 December 2012. It has been operating since 23 December 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 47 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Goose Willow Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 11.5 MW (this record)
- All phases
- 18.5 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- IKAROS SOLAR LIMITED
- Location
- Hanney Road, Abingdon, Oxfordshire, Oxfordshire, OX13 6AP, United Kingdom
- Planning authority
- Vale of White Horse
- Planning application
- P12/V2112/FUL
- First operating
- 2013
This record is 11.5 MW, one part of a site built in phases. With Goose Willow Farm - extension (7 MW) the phases on the register add up to 18.5 MW. Goose Willow Farm - extension
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P12/V2112/FUL, with what the planning evidence pack adds for this site.
Every application in Vale of White Horse · Alerts for applications and incidents near here
Timeline
- 18 October 2012 Planning application submitted
- 11 December 2012 Planning permission granted
- 31 July 2013 Construction started
- 23 December 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Goose Willow Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Goose Willow Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Goose Willow Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Goose Willow Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 February 2014.
- Where is Goose Willow Farm?
- 5.4 km north-east of Grove, Oxfordshire, United Kingdom (postcode OX13 6AP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).