Edge Lane, Maiden Law - Solar Farm & Battery Storage

Operator Lightsource BP

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 8 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Edge Lane, Maiden Law - Solar Farm & Battery Storage is a 49.9 MW solar farm on the edge of Annfield Plain, County Durham, United Kingdom. Its planning application (DM/22/01769/FPA) went to County Durham on 30 June 2022 and was granted on appeal on 22 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Edge Lane, Maiden Law - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 178 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool178 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells195 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire347 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Lightsource BP
Location
East Of Edge Lane Maiden Law, County Durham, DH7 0RY, United Kingdom
Planning authority
County Durham
Planning application
DM/22/01769/FPA
Appeal reference
25/00027/REF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/22/01769/FPA, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 30 June 2022 Planning application submitted
  • 10 March 2025 Planning permission refused
  • 24 June 2025 Appeal lodged
  • 22 April 2026 Planning permission granted
  • 22 April 2026 Appeal granted
  • 22 April 2029 Planning permission runs out

None found. The register holds no published incident that names Edge Lane, Maiden Law - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Edge Lane, Maiden Law - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Edge Lane, Maiden Law - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Edge Lane, Maiden Law - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 June 2026.
Where is Edge Lane, Maiden Law - Solar Farm & Battery Storage?
On the edge of Annfield Plain, County Durham, United Kingdom (postcode DH7 0RY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).