Solar · United Kingdom

Wagtail Lane, Craghead - Solar Panels

Operator Ampyr Energy UK Development Limited · Owner Ase Holdings 1 B.V.

Application Refused27 MWData checked 16 November 2026Source record dated 13 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wagtail Lane, Craghead - Solar Panels is a 27 MW solar farm on the edge of Stanley, County Durham, United Kingdom. Its planning application (DM/24/03466/FPA) went to County Durham on 7 January 2025 and was refused on 3 December 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 25 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 450 energy sites within 40 km for Wagtail Lane, Craghead - Solar Panels

Members see the sites and incidents around this one, and every record behind them.

AMPYR ENERGY UK DEVELOPMENT LIMITED (12683717), dissolved, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
27 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Ampyr Energy UK Development Limited
Owner
Ase Holdings 1 B.V.
Location
S/O Wagtail Lane, Craghead, Stanley, County Durham, DH9 7HH, United Kingdom
Planning authority
County Durham
Planning application
DM/24/03466/FPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/24/03466/FPA, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 7 January 2025 Planning application submitted
  • 3 December 2025 Planning permission refused

None found. The register holds no published incident that names Wagtail Lane, Craghead - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wagtail Lane, Craghead - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wagtail Lane, Craghead - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wagtail Lane, Craghead - Solar Panels?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2026.
Where is Wagtail Lane, Craghead - Solar Panels?
On the edge of Stanley, County Durham, United Kingdom (postcode DH9 7HH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).