Planning pack for this site, £295Other options

Battery storage · United Kingdom

Maiden, Annfield Plain - Energy Storage

Operator Stephenson Mohl Development

Awaiting Construction38 MWData checked 16 November 2026Source record dated 28 July 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Maiden, Annfield Plain - Energy Storage is a 38 MW battery storage site in Annfield Plain, County Durham, United Kingdom. Its planning application (DM/21/01583/FPA) went to County Durham on 5 May 2021 and was granted on 18 August 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Maiden, Annfield Plain - Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 179 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool179 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells196 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire349 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
38 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Stephenson Mohl Development
Location
Land To The South West Of Morrison Industrial Estate And West Of Lanchester Road Maiden Law, County Durham, DH9 7XW, United Kingdom
Planning authority
County Durham
Planning application
DM/21/01583/FPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/21/01583/FPA, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 5 May 2021 Planning application submitted
  • 18 August 2021 Planning permission granted
  • 18 August 2026 Planning permission expired

None found. The register holds no published incident that names Maiden, Annfield Plain - Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Maiden, Annfield Plain - Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maiden, Annfield Plain - Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Maiden, Annfield Plain - Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2022.
Where is Maiden, Annfield Plain - Energy Storage?
In Annfield Plain, County Durham, United Kingdom (postcode DH9 7XW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).