Solar · United Kingdom

The Engine Shed Field

Appeal Refused11 MWChecked 6 October 2026Last changed in the dataset 4 May 2016

Technology
Solar
Capacity
11 MW
Status
Appeal Refused
Operator or applicant
Lumicity
Location
Old Engine Shed Field, Sutton Court Farm, (Land between Pineham & East Langdon), Kent, United Kingdom
Planning authority
Dover
Planning application
13/01106
Appeal reference
APP/X2220/W/15/3138584

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 24 December 2013 Planning application submitted
  • 18 September 2015 Planning permission refused
  • 9 December 2015 Appeal lodged
  • 29 April 2016 Appeal refused

None found. The register holds no published incident that names The Engine Shed Field. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.