Tilmanstone Colliery is a 10 MW solar farm 8.9 km west of Deal, Kent, United Kingdom. Its planning application (13/00654) went to Dover on 15 August 2013 and was granted on 12 March 2014. It has been operating since 25 January 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

199 energy sites within 40 km for Tilmanstone Colliery

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Ovenden Plant Hire Limited
Location
Former Tilmanstone Colliery Tip, Pike Road, Eythorne, Dover, Kent, CT15 4DJ, United Kingdom
Planning authority
Dover
Planning application
13/00654
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/00654, with what the planning evidence pack adds for this site.

Every application in Dover · Alerts for applications and incidents near here

  • 15 August 2013 Planning application submitted
  • 12 March 2014 Planning permission granted
  • 10 December 2015 Construction started
  • 25 January 2016 Operational

None found. The register holds no published incident that names Tilmanstone Colliery. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tilmanstone Colliery had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tilmanstone Colliery; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tilmanstone Colliery?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2016.
Where is Tilmanstone Colliery?
8.9 km west of Deal, Kent, United Kingdom (postcode CT15 4DJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).