Solar · United Kingdom
Chalk Pit Solar Farm
Operator Greentech Services
Under Construction24 MWData checked 16 November 2026Source record dated 3 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Chalk Pit Solar Farm is a 24 MW solar farm 3.6 km north-east of Dover, Kent, United Kingdom. Its planning application (22/00668) went to Dover on 24 May 2022 and was granted on 25 November 2022. Construction started on 5 December 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 17 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Chalk Pit Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chalk Pit Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2069, Solar panel fire spreads through roof of new flats at Ebbsfleet, 18 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2069 | 2021 | Solar panel fire spreads through roof of new flats at Ebbsfleet | 18 km | Significant |
| EIR-1537 | 2021 | Garage fire from overheated solar batteries in South Woodham Ferrers | 74 km | Minor |
| EIR-1530 | 2023 | Electrical fault causes solar panel fire in Wickford house | 76 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 24 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Greentech Services
- Location
- N/O Guston & The Lane, Guston Court Farm, Dover, Kent, CT15, United Kingdom
- Planning authority
- Dover
- Planning application
- 22/00668
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/00668, with what the planning evidence pack adds for this site.
Every application in Dover · Alerts for applications and incidents near here
Timeline
- 24 May 2022 Planning application submitted
- 25 November 2022 Planning permission granted
- 5 December 2025 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Chalk Pit Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Chalk Pit Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Chalk Pit Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Chalk Pit Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2026.
- Where is Chalk Pit Solar Farm?
- 3.6 km north-east of Dover, Kent, United Kingdom (postcode CT15).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).