← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Dover

The Engine Shed Field

Appeal Refused11 MWApplication 13/01106Submitted 24 December 2013Refused on appeal 29 April 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
13/01106
Planning authority
Dover
County or area
Kent
Nation
England
Technology
Solar
Capacity
11 MW
Status
Appeal Refused
Operator or applicant
Lumicity
Location
Old Engine Shed Field, Sutton Court Farm, (Land between Pineham & East Langdon)
Appeal reference
APP/X2220/W/15/3138584
  • 24 December 2013 Planning application submitted
  • 18 September 2015 Planning permission refused
  • 9 December 2015 Appeal lodged
  • 29 April 2016 Appeal refused

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2069, Solar panel fire spreads through roof of new flats at Ebbsfleet, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet13 kmSignificant
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers71 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house73 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near The Engine Shed Field is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Dover.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.