Thame solar farm

Operational4.3 MWChecked 6 October 2026Last changed in the dataset 27 February 2017

Technology
Solar
Capacity
4.3 MW
Status
Operational
Operator or applicant
Big 60 Million
Location
Land to the east of Windmill Road, Towersey, Oxfordshire, OX9 3QH, United Kingdom
Planning authority
South Oxfordshire
Planning application
P14/S2242/FUL
Appeal reference
APP/Q3115/W/15/3032498
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 17 July 2014 Planning application submitted
  • 13 February 2015 Planning permission refused
  • 5 June 2015 Appeal lodged
  • 29 October 2015 Planning permission granted
  • 29 October 2015 Appeal granted
  • 16 September 2016 Construction started
  • 16 December 2016 Operational

None found. The register holds no published incident that names Thame solar farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.