Planning pack for this site, £295Other options

Solar · United Kingdom

Bumpers Farm Phase 2

Operator Anesco · Owner Quanesco Midco Limited

Awaiting Construction12 MWData checked 16 November 2026Source record dated 4 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bumpers Farm Phase 2 is a 12 MW solar farm 5.1 km north-west of Princes Risborough, Buckinghamshire, United Kingdom. Its planning application (14/01926/APP) went to Buckinghamshire on 11 July 2014 and was granted on appeal on 26 October 2015. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bumpers Farm Phase 2 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End22 kmMinor
EIR-29392026Rooftop solar fire forces West Drayton school to close early40 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford44 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, Buckinghamshire, HP17 8, United Kingdom
Planning authority
Buckinghamshire
Planning application
14/01926/APP
Appeal reference
APP/K0425/W/14/3001711

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01926/APP, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 11 July 2014 Planning application submitted
  • 5 September 2014 Planning permission refused
  • 4 February 2015 Appeal lodged
  • 26 October 2015 Planning permission granted
  • 26 October 2015 Appeal granted
  • 26 October 2018 Planning permission expired

None found. The register holds no published incident that names Bumpers Farm Phase 2. If you know of one, report it (confidential reports are anonymised).

Has Bumpers Farm Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bumpers Farm Phase 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bumpers Farm Phase 2?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2020.
Where is Bumpers Farm Phase 2?
5.1 km north-west of Princes Risborough, Buckinghamshire, United Kingdom (postcode HP17 8).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).