Solar · United Kingdom
Bumpers Farm Phase 2
Operator Anesco · Owner Quanesco Midco Limited
Awaiting Construction12 MWData checked 16 November 2026Source record dated 4 June 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bumpers Farm Phase 2 is a 12 MW solar farm 5.1 km north-west of Princes Risborough, Buckinghamshire, United Kingdom. Its planning application (14/01926/APP) went to Buckinghamshire on 11 July 2014 and was granted on appeal on 26 October 2015. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bumpers Farm Phase 2 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bumpers Farm Phase 2 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 22 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 22 km | Minor |
| EIR-2939 | 2026 | Rooftop solar fire forces West Drayton school to close early | 40 km | Significant |
| EIR-0774 | 2023 | Solar panel fire destroys roof of Ealing Council house in Greenford | 44 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 12 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Anesco
- Owner
- Quanesco Midco Limited
- Location
- Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, Buckinghamshire, HP17 8, United Kingdom
- Planning authority
- Buckinghamshire
- Planning application
- 14/01926/APP
- Appeal reference
- APP/K0425/W/14/3001711
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/01926/APP, with what the planning evidence pack adds for this site.
Every application in Buckinghamshire · Alerts for applications and incidents near here
Timeline
- 11 July 2014 Planning application submitted
- 5 September 2014 Planning permission refused
- 4 February 2015 Appeal lodged
- 26 October 2015 Planning permission granted
- 26 October 2015 Appeal granted
- 26 October 2018 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Bumpers Farm Phase 2. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bumpers Farm Phase 2 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bumpers Farm Phase 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bumpers Farm Phase 2?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2020.
- Where is Bumpers Farm Phase 2?
- 5.1 km north-west of Princes Risborough, Buckinghamshire, United Kingdom (postcode HP17 8).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).