Planning pack for this site, £295Other options

Battery storage · United Kingdom

Whirlbush Farm, Kingsey - Solar Farm & Battery Storage

Operator Stark Energy

Awaiting ConstructionData checked 16 November 2026Source record dated 27 April 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Whirlbush Farm, Kingsey - Solar Farm & Battery Storage is a battery storage site 5.4 km east of Thame, Buckinghamshire, United Kingdom. Its planning application (21/02821/APP) went to Buckinghamshire on 16 July 2021 and was granted on 3 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

22 Oct20 Nov
Balancing mechanismDynamic ContainmentDynamic ModerationQuick ReserveWholesaleBalancing ReserveSlow ReserveDynamic Regulation

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 7 Nov: 3,236 MWh out and 3,823 MWh in, active 80% of half hours, peak 24 MW of 99. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £8,139 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

STARK ENERGY LIMITED (11857289), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Whirlbush Farm, Kingsey - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 71 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire71 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction96 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells152 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Stark Energy
Location
Whirlbush Farm, Risborough Road, Kingsey, Aylesbury, Buckinghamshire, HP17 8NE, United Kingdom
Planning authority
Buckinghamshire
Planning application
21/02821/APP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/02821/APP, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 16 July 2021 Planning application submitted
  • 3 March 2022 Planning permission granted
  • 3 March 2025 Planning permission expired

None found. The register holds no published incident that names Whirlbush Farm, Kingsey - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Whirlbush Farm, Kingsey - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Whirlbush Farm, Kingsey - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Whirlbush Farm, Kingsey - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 April 2022.
Where is Whirlbush Farm, Kingsey - Solar Farm & Battery Storage?
5.4 km east of Thame, Buckinghamshire, United Kingdom (postcode HP17 8NE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).