← Back to Oxfordshire

Battery storage · United Kingdom

Howland Road - Energy Storage Facility

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Application Refused0.2 MWData checked 16 November 2026Source record dated 7 October 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Howland Road - Energy Storage Facility is a 0.2 MW battery storage site on the edge of Thame, Oxfordshire, United Kingdom. Its planning application (P26/S0864/FUL) went to South Oxfordshire on 19 March 2026 and was refused on 1 July 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 22 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 382 other sites and 611 energy sites within 40 km for Howland Road - Energy Storage Facility

Members see the sites and incidents around this one, and every record behind them.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Howland Road, Thame, Oxfordshire, OX9 3GQ, United Kingdom
Planning authority
South Oxfordshire
Planning application
P26/S0864/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P26/S0864/FUL, with what the planning evidence pack adds for this site.

Every application in South Oxfordshire · Alerts for applications and incidents near here

Status changed from Application Submitted to Application Refused on 16 November 2026.

  • 19 March 2026 Planning application submitted
  • 1 July 2026 Planning permission refused

None found. The register holds no published incident that names Howland Road - Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Howland Road - Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Howland Road - Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Howland Road - Energy Storage Facility?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Howland Road - Energy Storage Facility?
On the edge of Thame, Oxfordshire, United Kingdom (postcode OX9 3GQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).