Solar · United Kingdom
Tennis Courts, St Brides Castle - Solar Panels
Operator HPB Assurance Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 15 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tennis Courts, St Brides Castle - Solar Panels is a 0.2 MW solar farm 12 km west of Milford Haven, Dyfed, United Kingdom. Its planning application (NP/25/0572/FUL) went to Pembrokeshire on 6 October 2025 and was granted on 21 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tennis Courts, St Brides Castle - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tennis Courts, St Brides Castle - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1541, Transformer unit fire at a solar farm on Copshorn Road, Bodmin, 146 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1541 | 2015 | Transformer unit fire at a solar farm on Copshorn Road, Bodmin | 146 km | Minor |
| EIR-1544 | 2014 | Fire at solar panel installation near Bodmin Jail | 146 km | Minor |
| EIR-1539 | 2015 | Solar panel blown off bungalow roof onto vehicle in Newquay | 148 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- HPB Assurance Limited
- Location
- Tennis Courts, St Brides Castle, St Brides, Haverfordwest, Dyfed, SA62 3AL, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- NP/25/0572/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for NP/25/0572/FUL, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 6 October 2025 Planning application submitted
- 21 April 2026 Planning permission granted
- 21 April 2031 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Tennis Courts, St Brides Castle - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tennis Courts, St Brides Castle - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tennis Courts, St Brides Castle - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tennis Courts, St Brides Castle - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2026.
- Where is Tennis Courts, St Brides Castle - Solar Panels?
- 12 km west of Milford Haven, Dyfed, United Kingdom (postcode SA62 3AL).