Onshore wind · United Kingdom

Tappaghan Extension

Operator Greencoat UK Wind

Operational9 MWData checked 16 November 2026Source record dated 5 January 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tappaghan Extension is a 9 MW wind farm 16 km west of Dromore, Co. Fermanagh, United Kingdom. Its planning application (L/2006/1553/F) went to Fermanagh and Omagh on 12 June 2005 and was granted on 1 May 2008. It has been operating since 1 July 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 15 other sites and 142 energy sites within 40 km for Tappaghan Extension

Members see the sites and incidents around this one, and every record behind them.

GREENCOAT UK WIND PLC (08318092), active, since 2012. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
9 MW (this record)
All phases
28.5 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Greencoat UK Wind
Location
Lack, Tappaghan Mountains, Northern Ireland, Co. Fermanagh, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
L/2006/1553/F
First operating
2009
Turbines
6

This record is 9 MW, one part of a site built in phases. With Tappaghan (19.5 MW) the phases on the register add up to 28.5 MW. Tappaghan

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for L/2006/1553/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 12 June 2005 Planning application submitted
  • 1 May 2008 Planning permission granted
  • 1 July 2009 Operational

None found. The register holds no published incident that names Tappaghan Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tappaghan Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tappaghan Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Tappaghan Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2015.
Where is Tappaghan Extension?
16 km west of Dromore, Co. Fermanagh, United Kingdom.