Solar · United Kingdom
Sunnybank Road - Solar Photovoltaics Panel
Operator 3Ti Energy Hubs Limited
Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 10 May 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Sunnybank Road - Solar Photovoltaics Panel is a 0.4 MW solar farm on the edge of Crewe, Cheshire, United Kingdom. Its planning application (22/1495N) went to Cheshire East on 11 April 2022 and was granted on 31 May 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Sunnybank Road - Solar Photovoltaics Panel changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
3TI ENERGY HUBS LTD (11868514), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sunnybank Road - Solar Photovoltaics Panel sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 21 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 21 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 22 km | Minor |
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 24 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- 3Ti Energy Hubs Limited
- Location
- Legends Bentley Motors, Sunnybank Road, Crewe, Cheshire, CW2 8WD, United Kingdom
- Planning authority
- Cheshire East
- Planning application
- 22/1495N
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/1495N, with what the planning evidence pack adds for this site.
Every application in Cheshire East · Alerts for applications and incidents near here
Timeline
- 11 April 2022 Planning application submitted
- 31 May 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Sunnybank Road - Solar Photovoltaics Panel. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Sunnybank Road - Solar Photovoltaics Panel had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sunnybank Road - Solar Photovoltaics Panel; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Sunnybank Road - Solar Photovoltaics Panel?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 May 2022.
- Where is Sunnybank Road - Solar Photovoltaics Panel?
- On the edge of Crewe, Cheshire, United Kingdom (postcode CW2 8WD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).