← Back to Suffolk
Planning pack for this site, £295Other options

Solar · United Kingdom

Skyliner Way - Solar Array

Operator 3Ti Energy Hubs Limited

Awaiting Construction1 MWData checked 16 November 2026Source record dated 20 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Skyliner Way - Solar Array is a 1 MW solar farm 3.2 km east of Bury St Edmunds, Suffolk, United Kingdom. Its planning application (DC/24/0099/P14JPA) went to West Suffolk on 22 January 2024 and was granted on 6 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

3TI ENERGY HUBS LTD (11868514), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Skyliner Way - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2815, Solar panel on school roof starts primary school fire in Ipswich, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-28152026Solar panel on school roof starts primary school fire in Ipswich34 kmSignificant
EIR-27312021Electrical fault in solar panel control unit sparks loft fire in Ipswich34 kmMinor
EIR-25892022Rooftop solar panels reported to have overheated and sparked fire at Colchester church41 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
3Ti Energy Hubs Limited
Location
Unit 1, Skyliner Way, Bury St Edmunds, Suffolk, IP32 7FR, United Kingdom
Planning authority
West Suffolk
Planning application
DC/24/0099/P14JPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/24/0099/P14JPA, with what the planning evidence pack adds for this site.

Every application in West Suffolk · Alerts for applications and incidents near here

  • 22 January 2024 Planning application submitted
  • 6 March 2024 Planning permission granted

None found. The register holds no published incident that names Skyliner Way - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Skyliner Way - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Skyliner Way - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Skyliner Way - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 March 2024.
Where is Skyliner Way - Solar Array?
3.2 km east of Bury St Edmunds, Suffolk, United Kingdom (postcode IP32 7FR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).