← Back to Cheshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels

Operator 3Ti Energy Hubs Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 9 May 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels is a 0.2 MW solar farm on the edge of Crewe, Cheshire, United Kingdom. Its planning application (22/1633N) went to Cheshire East on 13 April 2022 and was granted on 26 May 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

3TI ENERGY HUBS LTD (11868514), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent21 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire22 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall23 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
3Ti Energy Hubs Limited
Location
Building B2, Bentley Motors Limited, Pyms Lane, Crewe, Cheshire, CW1 3PL, United Kingdom
Planning authority
Cheshire East
Planning application
22/1633N

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/1633N, with what the planning evidence pack adds for this site.

Every application in Cheshire East · Alerts for applications and incidents near here

  • 13 April 2022 Planning application submitted
  • 26 May 2022 Planning permission granted

None found. The register holds no published incident that names Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).

Has Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 May 2022.
Where is Building B2, Bentley Motors Limited, Pyms Lane - Solar PV Panels?
On the edge of Crewe, Cheshire, United Kingdom (postcode CW1 3PL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).