← Back to Wiltshire

Onshore wind · United Kingdom

Summerslade Down Wind Cluster

Operator PERTWOOD PARTNERS

Application Refused2.2 MWData checked 16 November 2026Source record dated 30 October 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Summerslade Down Wind Cluster is a 2.2 MW wind farm 7.1 km south of Warminster, Wiltshire, United Kingdom. Its planning application went to Wiltshire on 14 October 1998 and was refused on 17 May 1999. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

285 energy sites within 40 km for Summerslade Down Wind Cluster

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
PERTWOOD PARTNERS
Location
Warminster, Wiltshire, Wiltshire, United Kingdom
Planning authority
Wiltshire

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 14 October 1998 Planning application submitted
  • 17 May 1999 Planning permission refused

None found. The register holds no published incident that names Summerslade Down Wind Cluster. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Summerslade Down Wind Cluster had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Summerslade Down Wind Cluster; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Summerslade Down Wind Cluster?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 30 October 2011.
Where is Summerslade Down Wind Cluster?
7.1 km south of Warminster, Wiltshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).