← Back to Wiltshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Morrisons, Weymouth Street - Solar Panels

Operator Morrisons

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 30 January 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morrisons, Weymouth Street - Solar Panels is a 0.2 MW solar farm in Warminster, Wiltshire, United Kingdom. Its planning application (PL/2022/08326) went to Wiltshire on 27 October 2022 and was granted on 22 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

MORRISONS LIMITED (02280567), active, since 1988. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrisons, Weymouth Street - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton22 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol37 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels38 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Morrisons
Location
Morrisons, Weymouth Street, Warminster, Wiltshire, BA12 9NT, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2022/08326

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2022/08326, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 27 October 2022 Planning application submitted
  • 22 December 2022 Planning permission granted

None found. The register holds no published incident that names Morrisons, Weymouth Street - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Morrisons, Weymouth Street - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morrisons, Weymouth Street - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Morrisons, Weymouth Street - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 January 2023.
Where is Morrisons, Weymouth Street - Solar Panels?
In Warminster, Wiltshire, United Kingdom (postcode BA12 9NT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).