Solar · United Kingdom
Westbury (Closed) Landfill Site
Operator Viridor
Operational3.5 MWData checked 16 November 2026Source record dated 4 November 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Westbury (Closed) Landfill Site is a 3.5 MW solar farm on the edge of Westbury, Wiltshire, United Kingdom. Its planning application (13/01962/WCM) went to Wiltshire on 17 July 2013 and was granted on 21 October 2013. It has been operating since 5 August 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Westbury (Closed) Landfill Site changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 3.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Viridor
- Location
- LAND SOUTH OF 40 Park Lane Heywood Wiltshire, Wiltshire, United Kingdom
- Planning authority
- Wiltshire
- Planning application
- 13/01962/WCM
- First operating
- 2014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/01962/WCM, with what the planning evidence pack adds for this site.
Every application in Wiltshire · Alerts for applications and incidents near here
Timeline
- 17 July 2013 Planning application submitted
- 21 October 2013 Planning permission granted
- 1 May 2014 Construction started
- 5 August 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Westbury (Closed) Landfill Site. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Westbury (Closed) Landfill Site had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Westbury (Closed) Landfill Site; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Westbury (Closed) Landfill Site?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 November 2014.
- Where is Westbury (Closed) Landfill Site?
- On the edge of Westbury, Wiltshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).