← Back to Highland

Onshore wind · United Kingdom

Strathy North

Operator Scottish and Southern Energy (SSE)

Operational67.7 MWData checked 16 November 2026Source record dated 4 January 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Strathy North is a 67.7 MW wind farm 32 km west of Thurso, Highland, United Kingdom. Its planning application went to Scottish Government (S36) on 12 January 2007 and was granted on 22 November 2011. It has been operating since 1 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 48 other sites and 50 energy sites within 40 km for Strathy North

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 4,113 MWh, running 70% of half hours, peak 33 MW of 68, load factor 9%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £44,956 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
67.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish and Southern Energy (SSE)
Location
Near Strathy Village, Sutherland, Highland, United Kingdom
Planning authority
Scottish Government (S36)
First operating
2015
Turbines
33

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 12 January 2007 Planning application submitted
  • 22 November 2011 Planning permission granted
  • 31 January 2014 Construction started
  • 1 December 2015 Operational

None found. The register holds no published incident that names Strathy North. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Strathy North had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Strathy North; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Strathy North?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 January 2016.
Where is Strathy North?
32 km west of Thurso, Highland, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).