Onshore wind · United Kingdom
Cairnview, Bettyhill
Operator Bettyhill 2 Wind Limited
Awaiting Construction48 MWData checked 16 November 2026Source record dated 12 March 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cairnview, Bettyhill is a 48 MW wind farm 38 km west of Thurso, Highland, United Kingdom. Its planning application (23/00142/FUL) went to Highland on 12 January 2023 and was granted on 26 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 8 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Cairnview, Bettyhill changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cairnview, Bettyhill sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 192 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 192 km | Significant |
| EIR-0063 | 2024 | Fatal fall from turbine nacelle during onshore wind maintenance, UK | 192 km | Major |
| EIR-0032 | 2017 | Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment | 192 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 48 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Bettyhill 2 Wind Limited
- Location
- Land 2375M SE Of Cairnview Bettyhill, Highland, KW14 7TA, United Kingdom
- Planning authority
- Highland
- Planning application
- 23/00142/FUL
- Turbines
- 10, 149.9 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00142/FUL, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 12 January 2023 Planning application submitted
- 26 February 2024 Planning permission granted
- 26 February 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Cairnview, Bettyhill. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cairnview, Bettyhill had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cairnview, Bettyhill; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Cairnview, Bettyhill?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 March 2024.
- Where is Cairnview, Bettyhill?
- 38 km west of Thurso, Highland, United Kingdom (postcode KW14 7TA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).