← Back to Highland
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Loch Toftingall, Halsary Wind Farm - Battery Energy Storage

Operator Infinergy Limited & Boralex

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 18 February 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Loch Toftingall, Halsary Wind Farm - Battery Energy Storage is a 49.9 MW battery storage site 31 km west of Thurso, Highland, United Kingdom. Its planning application (23/04690/FUL) went to Highland on 28 September 2023 and was granted on 12 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Loch Toftingall, Halsary Wind Farm - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 578 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool578 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells631 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire772 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Infinergy Limited & Boralex
Location
Land To The South West Of Loch Toftingall, East Of The A9 & North Of Halsary Wind Farm, Highland, KW14 7SB, United Kingdom
Planning authority
Highland
Planning application
23/04690/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/04690/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 28 September 2023 Planning application submitted
  • 12 November 2024 Planning permission granted
  • 12 November 2027 Planning permission runs out

None found. The register holds no published incident that names Loch Toftingall, Halsary Wind Farm - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Loch Toftingall, Halsary Wind Farm - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Loch Toftingall, Halsary Wind Farm - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Loch Toftingall, Halsary Wind Farm - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 February 2025.
Where is Loch Toftingall, Halsary Wind Farm - Battery Energy Storage?
31 km west of Thurso, Highland, United Kingdom (postcode KW14 7SB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).