Solar · United Kingdom
Solar PV Energy Development in Ballycastle
Operator HHT Renewables Limited
Awaiting ConstructionData checked 16 November 2026Source record dated 28 October 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Solar PV Energy Development in Ballycastle is a solar farm in Ballycastle, Co. Causeway Coast & Glens, United Kingdom. Its planning application (LA01/2024/0410/F) went to Causeway Coast and Glens on 26 March 2024 and was granted on 8 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Solar PV Energy Development in Ballycastle changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Solar PV Energy Development in Ballycastle sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 200 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 200 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 221 km | Significant |
| EIR-1400 | 2023 | Solar panel and battery fire at a bungalow on Anglesey | 247 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- HHT Renewables Limited
- Location
- Lands Approximately 590m North West of 59 Moyarget Road, Ballycastle, Co. Causeway Coast & Glens, BT54, United Kingdom
- Planning authority
- Causeway Coast and Glens
- Planning application
- LA01/2024/0410/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA01/2024/0410/F, with what the planning evidence pack adds for this site.
Every application in Causeway Coast and Glens · Alerts for applications and incidents near here
Timeline
- 26 March 2024 Planning application submitted
- 8 October 2024 Planning permission granted
- 8 October 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Solar PV Energy Development in Ballycastle. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Solar PV Energy Development in Ballycastle had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Solar PV Energy Development in Ballycastle; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Solar PV Energy Development in Ballycastle?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2024.
- Where is Solar PV Energy Development in Ballycastle?
- In Ballycastle, Co. Causeway Coast & Glens, United Kingdom (postcode BT54).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).